Logo stampa
800 185 075 800 185 075

Forlž physiochemical treatment plant

Via Grigioni 28, Forlž

  • 1 / 1   Forlž physiochemical treatment plant

Forlž first flush rainwater treatment plant

The plant, located in Forlž at Via Grigioni 28, is aimed at treating first flush rainwater from the Forlž preselector area.

Page updated 26 August 2015

 
    Treatment capacity
    12,000 m3/year of first flush rainwater
    Types of waste accepted
    Storage of fire-fighting water Ecological Platform at via Grigioni 19

    Using a system of tanks, the collected first flush rainwater arrives via pipes from the preselector area and is equalised, treated in a lamellar pack filter and transferred to the final interposition tank pending discharge into the public sewers.

Map
Share this