Overview

The Montale waste to energy plant, owned by the wholly publicly owned company CIS S.p.A., covers about 23,050 m2 of which 5,346 m2 is permeable and 17,704 m2 non permeable. It aims to dispose of special waste and unsorted municipal waste produced within the collection basin of the ATO Toscana Centro, producing electricity using waste as an energy source.
The Herambiente Group was awarded the management of the plant for three years (renewable for an additional 12 months plus a possible six month technical extension). In addition to the day to day management from January 2025, Herambiente plans to carry out improvement works for more than 3.7 million euros that will positively affect the plant's operation and environmental performance.

The plant at present is composed of three disposal lines, two of which are in operation (L1 and L3) and one (L2) inactive since 2015.
By Ordinance of the Province of Pistoia No. 1245, confirmed by Tuscany Region Decree No. 1200 of 25.01.2023, the disposal of waste up to saturation of the thermal load, equal to 13 MWt for L1 and 10 MWt for L3, for a total of 23 MWt, was authorized.

Currently, the plant has an average daily disposal rate of about 150 tons/day.

Page updated to 2nd January 2025

ListInfo in Termovalorizzatore di Montale ENG

Plant specifications

Environmental compatibility in compliance with regulations in force (Legislative Decree 152/06)

  • Number of active waste to energy lines
    2
  • Total thermal capacity
    23 MWt
  • Combustion technology
    Rotary drum furnaces
  • Waste disposal capacity
    about 650 tonnes/day with an average net calorific value (NCV) equal to 2,500 kcal/kg 50 ktonnes/year
  • Annual operation
    8.000 ore
  • Nominal electric power
    7,7 MWe
  • Disposal operation
    D10
  • Type of waste accepted
    Municipal waste (EWC 20.03.01) and special waste from treatment plants (EWC 19.12.10 and 19.12.12).

TextImage in Termovalorizzatore di Montale ENG

Technology

How does the facility work?

The waste-to-energy plant enables the disposal of mixed waste through combustion. The resulting heat is harnessed for the production of thermal and electrical energy.

Title_Term_Montale

Phases of operation

Accordion_Term_Montale ENG

Available documents Faenza

Available documents

RicercaDocumentaleImpianti

Documents of the facility:

LinkGenerico_DocPeraccedereagliimpianti ENG

LCross_Term_Montale_ENG

BackgroundCrosslink

Chosen for you

You may also be interested in...